Production

Production Item Details

Meyya

Standard Batch: 1.00 units

Cost per Unit

MVR 839.27

Batch Cost (1.00 units)

MVR 839.27

Material Cost

$184.27

Labour Cost

$375.00

Machine Cost

$280.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
18mm pineboard (fingerjoint)
Area Package: 1.00 sqin
144.000 sqin per unit
Batch (1.00 units): 144.00 sqin
1 package(s) needed
$0.3147/sqin
$1450.00/package
$45.31/unit Batch: $1450.00
6mm pineboard (fingerjoint)
Area Package: 1.00 pcs
64.000 pcs per unit
Batch (1.00 units): 64.00 pcs
1 package(s) needed
$0.1400/pcs
$645.00/package
$8.96/unit Batch: $645.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
2.000 pcs per unit
Batch (1.00 units): 2.00 pcs
2 package(s) needed
$65.0000/pcs
$65.00/package
$130.00/unit Batch: $130.00
Total Material Cost: $184.27

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 180.00 min $125.00/hr $375.00
Total Labour Cost: $375.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 8.00 min $35.00/min $280.00
Total Machine Cost: $280.00