Production

Production Item Details

3Ms Pay

Standard Batch: 1.00 units

Cost per Unit

MVR 1,892.97

Batch Cost (1.00 units)

MVR 1,892.97

Material Cost

$742.97

Labour Cost

$1000.00

Machine Cost

$150.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic [Clear]
Area Package: 1.00 pcs
1152.000 pcs per unit
Batch (1.00 units): 1152.00 pcs
1 package(s) needed
$0.1975/pcs
$910.00/package
$227.50/unit Batch: $910.00
Glue & Tape
Count/Pieces Package: 1.00 pcs
5.000 pcs per unit
Batch (1.00 units): 5.00 pcs
5 package(s) needed
$20.0000/pcs
$20.00/package
$100.00/unit Batch: $100.00
Shipping
Count/Pieces Package: 1.00 pcs
20.000 pcs per unit
Batch (1.00 units): 20.00 pcs
20 package(s) needed
$10.0000/pcs
$10.00/package
$200.00/unit Batch: $200.00
Acrylic 6mm [white]
Area Package: 1.00 sqin
168.000 sqin per unit
Batch (1.00 units): 168.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$87.50/unit Batch: $2400.00
3mm Acrylic [Clear]
Area Package: 1.00 pcs
648.000 pcs per unit
Batch (1.00 units): 648.00 pcs
1 package(s) needed
$0.1975/pcs
$910.00/package
$127.97/unit Batch: $910.00
Total Material Cost: $742.97

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 480.00 min $125.00/hr $1000.00
Total Labour Cost: $1000.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 5.00 min $30.00/min $150.00
Total Machine Cost: $150.00