Production

Production Item Details

Sirru Nature Notice

Standard Batch: 1.00 units

Cost per Unit

MVR 396.00

Batch Cost (1.00 units)

MVR 396.00

Material Cost

$3.50

Labour Cost

$0.00

Machine Cost

$392.50

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
6mm pineboard (fingerjoint)
Area Package: 1.00 pcs
25.000 pcs per unit
Batch (1.00 units): 25.00 pcs
1 package(s) needed
$0.1400/pcs
$645.00/package
$3.50/unit Batch: $645.00
Total Material Cost: $3.50

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Laser Engraving Normal Laser Cutter Laser Engraving Normal 5.00 min $50.00/min $250.00
SQIN UV SQIN 25.00 min $5.00/min $125.00
6mm acrylic cut Laser Cutter 6mm acrylic cut 0.50 min $35.00/min $17.50
Total Machine Cost: $392.50