Production

Production Item Details

1818 Plaque

Standard Batch: 1.00 units

Cost per Unit

MVR 1,254.04

Batch Cost (1.00 units)

MVR 1,254.04

Material Cost

$247.40

Labour Cost

$0.00

Machine Cost

$1006.64

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [12mm]
Area Package: 1.00 sqin
361.000 sqin per unit
Batch (1.00 units): 361.00 sqin
1 package(s) needed
$0.1953/sqin
$900.00/package
$70.51/unit Batch: $900.00
Mirror Acrylic [Dovira]
Area Package: 1.00 sqin
324.000 sqin per unit
Batch (1.00 units): 324.00 sqin
1 package(s) needed
$0.2799/sqin
$1290.00/package
$90.70/unit Batch: $1290.00
Acrylic 6mm
Area Package: 1.00 sqin
42.000 sqin per unit
Batch (1.00 units): 42.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$21.19/unit Batch: $2325.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
1.000 pcs per unit
Batch (1.00 units): 1.00 pcs
1 package(s) needed
$65.0000/pcs
$65.00/package
$65.00/unit Batch: $65.00
Total Material Cost: $247.40

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 8.00 min $13.33/min $106.64
laser cut 3mm Laser Cutter laser cut 3mm 30.00 min $30.00/min $900.00
Total Machine Cost: $1006.64