Production

Production Item Details

77 Plaque

Standard Batch: 1.00 units

Cost per Unit

MVR 564.50

Batch Cost (1.00 units)

MVR 564.50

Material Cost

$61.18

Labour Cost

$0.00

Machine Cost

$503.32

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [12mm]
Area Package: 1.00 sqin
64.000 sqin per unit
Batch (1.00 units): 64.00 sqin
1 package(s) needed
$0.1953/sqin
$900.00/package
$12.50/unit Batch: $900.00
Mirror Acrylic [Dovira]
Area Package: 1.00 sqin
49.000 sqin per unit
Batch (1.00 units): 49.00 sqin
1 package(s) needed
$0.2799/sqin
$1290.00/package
$13.72/unit Batch: $1290.00
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
10.000 pcs per unit
Batch (1.00 units): 10.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$2.46/unit Batch: $1135.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
0.500 pcs per unit
Batch (1.00 units): 0.50 pcs
1 package(s) needed
$65.0000/pcs
$65.00/package
$32.50/unit Batch: $65.00
Total Material Cost: $61.18

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 4.00 min $13.33/min $53.32
laser cut 3mm Laser Cutter laser cut 3mm 15.00 min $30.00/min $450.00
Total Machine Cost: $503.32