Production

Production Item Details

Smores

Standard Batch: 1.00 units

Cost per Unit

MVR 7,902.70

Batch Cost (1.00 units)

MVR 7,902.70

Material Cost

$1627.75

Labour Cost

$0.00

Machine Cost

$6274.95

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
960.000 pcs per unit
Batch (1.00 units): 960.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$236.46/unit Batch: $1135.00
PVC Board [12mm]
Area Package: 1.00 sqin
1197.000 sqin per unit
Batch (1.00 units): 1197.00 sqin
1 package(s) needed
$0.1953/sqin
$900.00/package
$233.79/unit Batch: $900.00
MMLA Outdoor
Weight Package: 1000.00 g
1000.000 g per unit
Batch (1.00 units): 1000.00 g
1 package(s) needed
$1.0000/g
$1000.00/package
$1000.00/unit Batch: $1000.00
LED Strip
Length Package: 1.00 in
315.000 in per unit
Batch (1.00 units): 315.00 in
315 package(s) needed
$0.5000/in
$0.50/package
$157.50/unit Batch: $157.50
Total Material Cost: $1627.75

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 15.00 min $13.33/min $199.95
shell 3D Printer shell 16.50 min $350.00/min $5775.00
laser cut 3mm Laser Cutter laser cut 3mm 10.00 min $30.00/min $300.00
Total Machine Cost: $6274.95