Production

Production Item Details

The normal cafe

Standard Batch: 1.00 units

Cost per Unit

MVR 1,587.17

Batch Cost (1.00 units)

MVR 1,587.17

Material Cost

$922.17

Labour Cost

$0.00

Machine Cost

$665.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic [Clear]
Area Package: 1.00 pcs
2268.000 pcs per unit
Batch (1.00 units): 2268.00 pcs
1 package(s) needed
$0.1975/pcs
$910.00/package
$447.89/unit Batch: $910.00
Acrylic 6mm
Area Package: 1.00 sqin
940.000 sqin per unit
Batch (1.00 units): 940.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$474.28/unit Batch: $2325.00
Total Material Cost: $922.17

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 19.00 min $35.00/min $665.00
Total Machine Cost: $665.00