Production

Production Item Details

Nautilus

Standard Batch: 1.00 units

Logo cutout signage

Cost per Unit

MVR 10,072.50

Batch Cost (1.00 units)

MVR 10,072.50

Material Cost

$3747.50

Labour Cost

$375.00

Machine Cost

$5950.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqft
6912.000 sqft per unit
Batch (1.00 units): 6912.00 sqft
2 package(s) needed
$0.5046/sqft
$2325.00/package
$3487.50/unit Batch: $4650.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
4.000 pcs per unit
Batch (1.00 units): 4.00 pcs
4 package(s) needed
$65.0000/pcs
$65.00/package
$260.00/unit Batch: $260.00
Total Material Cost: $3747.50

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 180.00 min $125.00/hr $375.00
Total Labour Cost: $375.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 170.00 min $35.00/min $5950.00
Total Machine Cost: $5950.00