Production

Production Item Details

Sellyoak

Standard Batch: 1.00 units

Cost per Unit

MVR 12,995.00

Batch Cost (1.00 units)

MVR 12,995.00

Material Cost

$8420.00

Labour Cost

$3000.00

Machine Cost

$1575.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [12mm]
Area Package: 1.00 sqin
9216.000 sqin per unit
Batch (1.00 units): 9216.00 sqin
2 package(s) needed
$0.1953/sqin
$900.00/package
$1800.00/unit Batch: $1800.00
Acrylic 6mm [white]
Area Package: 1.00 sqin
2304.000 sqin per unit
Batch (1.00 units): 2304.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$1200.00/unit Batch: $2400.00
Glue & Tape
Count/Pieces Package: 1.00 pcs
30.000 pcs per unit
Batch (1.00 units): 30.00 pcs
30 package(s) needed
$20.0000/pcs
$20.00/package
$600.00/unit Batch: $600.00
Acrylic 6mm [white]
Area Package: 1.00 sqin
9216.000 sqin per unit
Batch (1.00 units): 9216.00 sqin
2 package(s) needed
$0.5208/sqin
$2400.00/package
$4800.00/unit Batch: $4800.00
Led Light
Count/Pieces Package: 10.00 pcs
100.000 pcs per unit
Batch (1.00 units): 100.00 pcs
10 package(s) needed
$0.2000/pcs
$2.00/package
$20.00/unit Batch: $20.00
Total Material Cost: $8420.00

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 1440.00 min $125.00/hr $3000.00
Total Labour Cost: $3000.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 45.00 min $35.00/min $1575.00
Total Machine Cost: $1575.00