Production

Production Item Details

fannys pearl

Standard Batch: 1.00 units

Cost per Unit

MVR 5,527.34

Batch Cost (1.00 units)

MVR 5,527.34

Material Cost

$2527.34

Labour Cost

$0.00

Machine Cost

$3000.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic [Clear]
Area Package: 1.00 pcs
3600.000 pcs per unit
Batch (1.00 units): 3600.00 pcs
1 package(s) needed
$0.1975/pcs
$910.00/package
$710.94/unit Batch: $910.00
Acrylic 6mm
Area Package: 1.00 sqin
3600.000 sqin per unit
Batch (1.00 units): 3600.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$1816.41/unit Batch: $2325.00
Total Material Cost: $2527.34

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 60.00 min $35.00/min $2100.00
laser cut 3mm Laser Cutter laser cut 3mm 30.00 min $30.00/min $900.00
Total Machine Cost: $3000.00