Production

Production Item Details

Kanduhulhudhoo Sign

Standard Batch: 1.00 units

Cost per Unit

MVR 8,636.46

Batch Cost (1.00 units)

MVR 8,636.46

Material Cost

$2086.46

Labour Cost

$0.00

Machine Cost

$6550.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
MMLA Outdoor
Weight Package: 1000.00 g
1000.000 g per unit
Batch (1.00 units): 1000.00 g
1 package(s) needed
$1.0000/g
$1000.00/package
$1000.00/unit Batch: $1000.00
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
960.000 pcs per unit
Batch (1.00 units): 960.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$236.46/unit Batch: $1135.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
10.000 pcs per unit
Batch (1.00 units): 10.00 pcs
10 package(s) needed
$65.0000/pcs
$65.00/package
$650.00/unit Batch: $650.00
Shipping
Count/Pieces Package: 1.00 pcs
10.000 pcs per unit
Batch (1.00 units): 10.00 pcs
10 package(s) needed
$10.0000/pcs
$10.00/package
$100.00/unit Batch: $100.00
Glue & Tape
Count/Pieces Package: 1.00 pcs
5.000 pcs per unit
Batch (1.00 units): 5.00 pcs
5 package(s) needed
$20.0000/pcs
$20.00/package
$100.00/unit Batch: $100.00
Total Material Cost: $2086.46

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 20.00 min $30.00/min $600.00
shell 3D Printer shell 17.00 min $350.00/min $5950.00
Total Machine Cost: $6550.00